INTERRA provided field and plant inspection and testing for asphalt and concrete for this new 18,665 square-foot, two story full services branch library which replaced the existing Edgewater Branch Library. INTERRA also conducted testing and inspection for soil compaction, structural steel, rebar, floor flatness, and caissons. INTERRA also performed fire-safe inspection and testing as part of this project. Also, INTERRA provided monitoring during Geothermal drilling.
To see more Public Building Commission projects please click here.