This IDOT project took place at night and involved resurfacing, a pedestrian ramp improvement, and culvert repair on US 41 and on IL 22. Testing was conducted on asphalt both at the plant and in the field. Testing was also done on patching and for a shoulder. Project involved 100,000 tons of Pay For Performance (PFP) and Quality Control for Performance (QCP). Quality Assurance services on SMA mixes included test strips.