This St. Anthony’s Hospital project took place in Lake of Four Seasons, Indiana. The project included the development of a medical office building, a mobile MRI Unit, and a parking lot for the new structure. INTERRA performed subsurface soil exploration, drilling boreholes, and collecting soil samples for additional analysis. INTERRA monitored groundwater during the drilling. Work in the INTERRA laboratory included moisture content tests and unconfined compressive strength tests using a pocket penetrometer on samples collected. Additional tests included grainsize analysis and Atterberg limits on all the shelby tube samples. Each sample was classified by a Geotechnical Engineer.